Installation & Assembly
INSTALLATION INSTRUCTIONS:
PLAYHOUSE
PAGE
5/8
4
CONNECTING GATE TO FRAME (CONTINUED) (a s tep stool or l a dd er is re commended)
Bottom
Top
4F
4H
4G
4F. Position the gate inside the frame
as shown in the diagram. Slide
the female hinges on tube D so
they are between the secured
male hinges on the vertical tube
A .
4G. Push the lower female hinge
down and slide it over the male
ange. Note that there should
be a gap of approximately 1 inch
on the top and bottom between
the gate and the frame of the
Playhouse. Tigten the nut on the
lower female hinge to hold the
gate in place.
4H. Push the upper female hinge up and slide it over the male ange. Note that
there should be a gap of approximately 1 inch on the top and bottom between
the gate and the frame of the Playhouse. Tigten the nut on the upper female
hinge to hold the gate in place.
4H. Check to ensure the gap between the gate frame and the Playhouse frame are
the same on top and bottom (centered vertically). Adjust hinges as necessary.
Once in place, tighten all nuts on both male and female sides of the hinge.
4I. At this point you should have a frame with gate attached as shown in diagram 4I.
4I
A
D