Installation & Assembly

]Um
Start at one end first. Weave the
upper mesh side panel onto the
alternating-direction loops.
Finish at the other end using the
same method.
Along the front and back,
bend the tab down over both
horizontal wires.
3
PIECES
4
PIECES
]T
3
]T
3
]T
4
]T
4
]T
5
]T
5
]T
6
]T
6
]Pr
3
]Pr
3
Install the final platform. Add the ramp. Insert the remaining tunnel trails.
Made in China