Installation & Assembly

Instruction Sheet
Contents:
1. Base (Either 12 x 16 or 16 x 16)
2. Post (1 Post for 15”, 18”, & 20”. 2 Posts for 30”, 36”, & 40”)
3. Spring Toy Ball with spring attached
4. Dangle Toy Ball with string attached
5. Hardware Pack (1 for 15”, 18”, & 20”. 2 for 30”, 36”, & 40”)
a. Please note for 30”, 36”, & 40” versions you will not need all of the
hardware provided)
b. Hardware Pack consists of:
i. Allen Wrench
ii. Bolt 1 5/8” long
iii. Washer
iv. Anisopleural Double Sided Bolt (one without a head on the
bolt) 2 3/8” long
6. Topper Round disk covered in fur with T-Nut in bottom
7. Spacer Round disk covered in fur with no nut and a hole through center Only
with 30”, 36”, & 40” units
8.
Instructions:
1. Take Base and put it at a 45-degree angle with bottom black felt towards you.
2. Feel along center cut line with your finger till you feel the indention where bolt will go through.
3. Take Bolt and Washer and put through the hole.
4. Take Post and screw it onto the bolt using Allen wrench to tighten.
5. For 15”, 18”, & 20” units continue next step. For 30”, 36”, & 40” skip to step 10.
6. Take Anisopleural Double Sided Bolt and screw long side of threads into the top of the Post. Tighten by hand.
7. Take Dangle Toy and place looped end of the string around the Anisopleural Double Sided Bolt.
8. Take Topper and screw it onto the Anisopleural Double Sided Bolt.
9. To put Spring Toy on:
a. Take base and feel on opposite side of the center cut line (one side of it) and you will feel a T-Nut to screw the spring
toy into.
10. For 30”, 36”, & 40” units
a. Take Anisopleural Double Sided Bolt and screw short side of threads into the top of the Post. Tighten by hand.
b. Then take Spacer and put on Anisopleural Double Sided Bolt.
c. Take second Post and screw it onto the Anisopleural Double Sided Bolt. Tighten by hand.
d. Take second Anisopleural Double Sided Bolt in the second hardware pack and screw long side of threads into the
top of the second Post. Tighten by hand.
e. Take Dangle Toy and place lop looped end of the string around the Anisopleural Double Sided Bolt.
f. Take Topper and screw it onto the Anisopleural Double Sided Bolt.
g. To put Spring Toy on:
i. Take base and feel on either side of the center cut line towards the edge and you will feel a T-Nut to screw
the spring toy into.

Summary of content (1 pages)