Phau Ntawv Qhia

4
7a. Installation
2
84mm
MOUNTING
SCREW x 2
1
This section covers installation without the use of the corner
bracket. If the corner bracket is required for installation refer
to section 7b Installation (Corner Bracket).
• Mark the position of the mounting holes on the wall
using the back box as a template (See image 1).
Drill the holes ensuring not to infringe
with any gas/water pipes or electrical
cables that may be hidden below the surface.
• Insert the rawl plugs into the holes.
• Pass the mains supply cables through the back box, using the
appropriate knockouts and cable entry points to prepare for
termination. Ensure the grommets are used to maintain the IP
rating of the luminaire.
• Fix the back box to the wall using the two mounting screws,
making sure it
is the correct
way up. Take care
not to over-tighten the
screws to prevent damage to
the back box. (See Image 2).
• The mains supply cable can now be terminated. Please refer to
section 8 (Connection Diagram).