Tus neeg siv phau ntawv
Table Of Contents
- NOTE:
- BATTERY INSTALLATION & REPLACEMENT
- SCAN: Display changes according to the next diagra
- COUNT: The current count with starting exercise.
- DISTANCE (DIST): The current distance with startin
- TIME: The total working times with starting exerci
- TOTAL COUNT (TOT): The total count which this func
- CALORIES: The calorie burned with starting exercis
- CALORIES (CAL): The calorie burned with starting e
- SPM: Number of strokes per minute, indicating the
- T/500M: The time for 500 meters during exercise
7
BATTERY INSTALLATION & REPLACEMENT
I
67-1
67
BATTERY INSTALLATION:
1. Take out 2 AAA batteries from the PE bag.
2. Press down on the buckle of battery cover on the back of the Meter (No. 67), then remove
battery cover.
3. Install 2 AAA batteries into the battery case on the back of the Meter (No.67). Pay attention to
the battery + and – poles before installing.
4. Press down on the buckle of battery cover, then put the battery cover back to the back of the
Meter (No. 67).
The installation is complete!
BATTERY REPLACEMENT:
1. Press down on the buckle of battery cover on the back of the Meter (No. 67), then remove
battery cover.
2. Remove the 2 old AAA batteries in the battery case and install 2 new AAA batteries into the
battery case on the back of the Meter (No. 67). Pay attention to the battery + and – poles before
installing.
3. Press down on the buckle of battery cover, then put the battery cover back to the back of the
Meter (No. 67).
The replacement is complete!
NOTE: Always change both batteries at the same time. Do not mix battery types and do not mix old
and new batteries. Dispose batteries according to your state and regional guidelines.