Install Guide and User's Manual
35
15 INCH & 24 INCH INSTALL GUIDE
A
A
E
E
B
B
F
F
D
D
C
C
CHANGING CO
2
 GAS CYLINDER
FOLLOW THESE INSTRUCTIONS AT ALL TIMES WHEN YOU REPLACE A CO2 GAS CYLINDER:
1. Close cylinder at “A”.
2. Remove tap “D” from barrel. Pull pressure release ring on body of tap to release
pressure remaining in line. (Do not close “C”).
3. Remove or loosen regulator key “B” by turning counter clockwise.
4. Remove regulator from used cylinder at “E”.
5. Remove dust cap from new gas cylinder at “E” and clear dust from outlet by opening and 
closing valve “A” quickly using appropriate wrench.
6. Attach regulator to new cylinder at “E”. (Use new fiber/plastic washer, if required).
7. Open valve “A” all the way.
8. Close valve “C”.
9. Adjust regulator key “B” by turning clockwise to set pressure. (Check setting by opening “C” 
and pulling and releasing the ring “F” on the pressure release valve on the body of the tap).
10. Tap barrel at “D” with valve “C” open.
NOTE: DO NOT LAY CO2 CYLINDERS FLAT. DO 
NOT DROP CO2 CYLINDERS.
IT REQUIRES 1/2 POUND CO2 TO DISPENSE 1/2 
BARREL OF BEER AT 38˚F WITH 15 POUNDS 
PRESSURE ON BARREL.
PRESSURE ADJUSTMENT ON CO
2
 REGULATOR
INCREASING PRESSURE:
1. Close regulator shut-off “C”.
2. Turn regulator key “B” clockwise and make setting.
3. Tap gauge for accurate reading.
4. Open regulator shut-off “C” and draw beer.
DECREASING PRESSURE:
1. Close regulator shut-off “C”.
2. Untap barrel at “D” and to bleed line, activate tap 
handle. Leave in open position.
3. Slowly open regulator shut-off “C” and 
simultaneously turn regulator key counter-clockwise 
to zero reading.
4. Close regulator shut-off “C” and set pressure by 
turning regulator key clockwise. Check setting by 
opening and closing valve “C”.
5. Close tap head “D”. (Put in “OFF” position).
6. Tap barrel at “D” and open regulator shut-off “C”.
15 INCH
24 INCH










