Installation Instructions

RECOMMENDED HEIGHT:
36
II
FROM FLOOR TO
CENTER OF HANDLE.
USE TEMPLATE ENCLOSED TO MARK
OFF INSTALLATION HOLES ON BOTH
SIDES OF DOOR AND EDGE.
INSTALL LATCH AND
SECURE WITH SCREWS.
A. INSERT CYLINDER (A) IN DECORATIVE
TRIM (B & C) AND PRESS AGAINST DOOR
MAKING CERTAIN THE STEM (D) IS
PROPERLY POSITIONED IN LATCH HOLES.
B. SLIDE INSIDE MATING TRIM (E) ONTO
STEM (D), AND SECURE WITH
MACHINE SCREWS (F).
(A)
(B)
(E)
(F)
(A)
(B)
(C)
(D)
MAKE MARK FOR 1
II
HOLES
ON DOOR EDGE FOR LATCH.
B. DRILL 1
II
HOLES IN
DOOR EDGE FOR LATCH.
C. DRILL 5/16
II
HOLES FOR
BOTTOM OF HANDLE
MOUNTING SCREW.
1
2
A. INSERT HANDLESET AND
DEADBOLT LATCHES IN 1”
HOLES ON EDGE OF DOOR.
MARK OUTLINES AND REMOVE
LATCHES.
C. INSERT DEADBOLT
LATCH AND SECURE
WITH WOOD SCREWS.
D. REPEAT PROCEDURE FOR
HANDLESET LATCH.
CLOSE DOOR UNTIL LATCH
BOLT TOUCHES DOOR JAMB.
MARK DOOR JAMB WITH
A PENCIL
A. CENTER THE STRIKER PLATES
ON THE DOOR JAMB WITHIN THE
AREAS MARKED IN STEP 7.
B. MARK OUTLINE OF STRIKER PLATE
FOR BOTH LATCH AND DEADBOLT
STRIKER PLATE.
MAKE MARK FOR 2
II
HOLES ON DOOR FACE
AND 5/16
II
HOLE FOR
BOTTOM HANDLE
MOUNT.
5/16
II
5/16
II
HOLE
8
II

Summary of content (1 pages)