ASSEMBLY Overview » Remove packaging materials farm snow blower. «+ Rotate Handle into the upright position. Refer to Handle Assembly, < Install the chute. Refer to Chute Assembly Options, « Complete saw blower assembly according to model and equipment, Refer to Set-up. « If necessary make adjustments to ensure proper swan blower operation. Refer o Adjustments, « Add fuel and oll.
LA . Attach the two carriage bolts {b) and nuts {2} removed in Step 2. Finish securing the handle by tightening the top twa nuts {enclosed in Step 2. See Figure S o Figure for models with side supports.
ASSEMBLE Side Mounted Chute Rotation Control w/ Manual Pitch Figure 8 Figure$ 2. Close flange leapers to secure chute assembly o chute base. Flange keepers will slick anti place when properly secured (Figure 10}, Figure 10 ROTE: Ensure the lower chute s secured ta the flange on the chute base. The lower edge of the chute keeper should be prioritized below the Paige o the chute base after being sicked into place.
ASSEMBLY f Chute Control Head 5. Remove hairpin clip {3) from rear of chute control head 2 {Figure 17). Figure 17 6. Insert chute contra rod {b) into rear of chute control head Figure t Figure 17) and secure with hairpin clip (a) removed in Step 5, 2.
b IA Chute Control Collar Top View 2 Shiite Central {One O'clock Position) Figure 22 IMPORTANT: Chute will not rotate without squeezing trigger chute control. NOTE: for smoothest operation, cables should all be ta the left of the chute control red. 2. Insert chute control rod into chute control head, Push rod as fainter chute control head as possible, keeping holes in rod pointing upward {Figure 20). 5.
L 7 Push chute control rad toward control panel until hole in rod lines up with hole in chute control input collar doses to chute controlled and insert hairpin clip {2} removed in Step 1{Figure 25}, Figure QUOTE: Second hale is used 10 achieve further engagement of chute control rod inch pinion gear, if required. Refer to Product Care section for Chute Contralto Rod adjustments. o .
1 §. Perform one of the following to connect the flex shaft tithe chute control rod coupling: « Models with Overhead Rotational insert hex end of flex shaft into chute control rod coupling under handier pane {Figure 303, N 0 Hydro Models Fire 33 1. Insert ferrule into top hole of shift fever and secure with cotter pin {2} and washer {b) removed in Step § (Figure 32). Ferule may need to be adjusted up or down.
LR Chute Control Head 1 Chute Support Bracket Figure v 5. Insert other end of chute control rod into tippler below Figure handle panel. Make sure ta line up flat end of rod and flat end NOTE: For smoothest operation, cables should all be ta the lee of af couplet. You may need to rotate rod around unit] these two the chute control! rod. surfaces line up {Figure 39 inset). 2. Insert round end of chute control rod into chute control head.
Set-lip CHUTE CONTROL CABLE ROUTING (IF EQUIPPED) Far medals equipped with Z-way or 4-way chute controls, electric chute control and/or chute-pitch controls, ensure control cables are routed properly.
ASSEMBLY Tool-less Adjustable Drift {utter Tool-less Non Adjustable Bright Cutter Figure 44 2. Turn the daft cutters around and position them as shown in Figure 44 to the outside of the auger housing. 3. Attach drift cutters with carriage baits {a) and wing nuts (b} remove din Step 1. SKID SHOES (IF APPLICABLE) Select models require the installation to the provided skid shoes. 1.