Installation Manual
Machine structure check and nuts debug
A
Adjustable nuts are on the back of the print head, the back of the hot bed and the two ends
of the X axis (the beam with the print head), total of 4 positions.
The machine has been pre-installed and strictly tested before leaving the factory. During the
bumpy process of long-distance transportation, few number of loose parts may occur. In
order to achieve better printing results, it is better to check before use.
Check whether it is loose by moving the parts in below picture.
Done !
The black PVC sticker needs to tear off the
white paper on the back, and then paste it on
the aluminum plate or use it directly on the
hot bed.
DC
B
2






