User Manual

41
FT7000
XP
- SITE PREPARATION AND INSTALLATION GUIDE
STEP 5:
(Outside facility) Remove the trim hardware brackets.
(Inside facility) Move the unit (you may have to raise the plinth assembly) to drill/install anchor
bolts. Move unit back through opening, lower plinth assembly to floor (if applicable), and anchor unit.
STEP 4:
Inside facility - lower the leveling feet (plinth assembly) to the interior floor, if applicable. Mark the anchor
holes. See dotted lines below for anchor hole placement.
STEP 3:
Move unit so collar brackets are as close to flush against wall.
Note: If there are uneven gaps between brackets and wall (ex: larger gap on bottom), this may be
tightened by adjusting leveling feet after unit is anchored.