Owner Manual
11
UPGRADE KIT ASSEMBLY PROCEDURES
1. Electronic Journal (EJ) and Bracket - The EJ (yellow), bracket, and cables (2 - EJ to dispenser, EJ to docking board)
should be pre-assembled in the kit. If they are not, use Figure 1 as a reference for assembly. Locate the two (2) bolts
in the upper right, rear of the vault area (Figure 2). Mount the EJ assembly to the bolts (cable connects towards top of
cabinet, Figure 3) and secure with the two (2) Kep nuts provided using a 7/16" nut driver.
Figure 1. EJ and hardware assembly.
Figure 2. Mounting bolt location.
Figure 3. EJ mounted.
2. Slide Rail Mounting Brackets - Locate the two (2) mounting brackets in kit (Figure 4). There is a Left (L) and Right
(R) specific. Mount brackets by first starting backslot (Figure 5) on the rear screw and rotating down over the other
two (2) screws. Using an 11/32" nut driver, secure the hex nuts.
* Important*
Ensure all screws are fully seated
in the bracket slots and not
resting on bracket. Brackets
must be level when installed!
Right
Left
Mounting brackets
Backslot seated
fully
Figure 4. Rail mounting brackets.
Figure 5. Mount bracket on rear screw
first, then rotate down.
3. Slide Assemblies - Install slide rails to the mounting brackets. Start a truss phillips screw in the second to last hole of
the slide assembly first (Figure 6). Extend rails out and install the other two (2) screws and secure all. Push in slide
rails. When installed correctly, the front of slide rails will be flush with mounting brackets (Figures 7 and 8).
Figures 7 and 8.
Slide rails flush w/bracket front.
Figure 6. Slide rail.