Owner Manual

2-14
HOLE CLOSEOUT BRACKET KIT
10. Install the lower closeout bracket on the bolts
in the lower cabinet. Using the 7/16” hollow
shaft but driver, install the nuts on the bolts;
6 nuts on the nut and 4 bolts in the middle.
While tightening, ensure the bolts and bracket
are sitting at in the upper cabinet.
11. Plug the cables into the back of the SDD
dispenser and tighten the thumbscrews on the
communication cable to secure it. Reinstall
the dispenser into the unit.
12. Route all the cables in the upper cabinet
through the cable clip previously installed.
Route the cables under the bracket as shown.