Owner Manual

2-7
RL5000 SDD
11. Plug the cables into the back of the SDD
dispenser and tighten the thumbscrews on the
communication cable to secure it. Reinstall
the dispenser into the unit.
12. Ensure all excess security module power
cable and communication cable is pulled into
the upper cabinet. Loop the security module
power cable back on itself to condense the
length of the cable. TY Wrap the cable and
cut off the excess (blue box). TY Wrap the
cables on the side of the power supply and cut
off excess (green arrow).