Installation manual
5
ARGO Installation Manual
SITE PREPARATION CHECKLIST
1. Select site and design oor plan accordingly.
2. Ensure all environmental conditions are met.
3. Establish contractor and vendor schedules.
4. Check communication line requirements.
5. Plan installation and accessory needs before starting.
6. Check oor plan and make necessary alterations.
7. Install all required electrical xtures.
8. Prepare site for communications needs.
9. Plan operator/training exercises (optional).
10. Install communication lines and test.
11. Ensure installation accessories are available.