Installation manual
20
ARGO Installation Manual
. Ensure the cabinet is as level as possible given the oor conditions. Use a bubble level to verify this. If a
bubble-level is not available, the cabinet can be “rocked” gently from front-to-back and side-to-side to check
the need for leveling.
Use a torque wrench and 3/4” [19mm] socket to tighten each nut to 60 foot-pounds (required to establish
the maximum pull-out strength of the anchors). If a torque wrench is not available, use a ratchet wrench
and 3/4” [19mm] socket to tighten the nuts three full turns beyond hand tight. DO NOT overtighten.
Once the nuts are tightened as specied in Step 7, install a second nut on each bolt, to act as a jam nut,
and tighten down rmly.
Use anchor bolt in each mounting hole
Hammer bolts snuggly into drilled holes
Whether you are installing a new AC socket outlet or plan to use an existing outlet to supply power to the
ATM, make sure the following requirements are met:
e outlet is located near the equipment. Extension cords are not recommended.
AC power for the terminal should come from a dedicated source with an isolated ground. e ATM
is designed to work on an IT (Isolated-Terra) type power system having phase-to-phase voltage not
exceeding 120 or 240 volts.
e outlet is easily accessible and will not be blocked once the equipment is installed and anchored.