Instructions / Assembly

Installation & Assembly Instructions
Please contact Customer Service with any questions at:
30700 D Carter Street ∙ Solon, OH 44139 ∙ (P) 440.248.5480 ∙ support@tritonproducts.com
For a full line of products visit www.tritonproducts.com 2
L. Insert each screw into its pre-installed wall anchor or assigned hole location. Using a #2 Phillips
head screwdriver and starting from one of the top corner hole locations insert screws halfway.
(This will leave you enough play/flexibility to insert each screw properly.)
M. Once all 8 wood screws have been installed halfway, tighten all screws down to a point that all
spacers are snug against wall surface. (Always Avoid Over Tightening of Any Screw.)
Repeat Instructions for installation of second pegboard panel
3. Hook Installation: (Using a handheld Phillips head screwdriver)
A) Insert hooks panel engaging tab through first hole in pegboard.
B) Align hooks screw hole with second hole in pegboard.
- Secure in place using small Phillips head screws and hand held screwdriver non-powered. (Do
not use 2” long wood screws as these are part of the mounting hardware for the DuraBoard.
- Do not over tighten screws used for mounting DuraHooks
Note: All hooks can be mounted horizontally or vertically to store items and can be combined with
one another to create storage solutions for heavier and odd shaped items and tools.