Installation Manual

Table Of Contents
Alignment Procedures
4-2 © 1999 Triton Network Systems, Inc. All Rights Reserved.
Setup
Before Starting
Before starting the procedures in this chapter, ensure that the IFUs have been
mounted at the near-end site and far-end site, and that the cables have been
tested.
Preparing for Installation
Table 4-1 identifies the basic aligning tools required for aligning the near-end
and far-end sites.
Table 4-1. Site Aligning Tools
Item
No.
Description Qty.
1 IFU Link Manager test cable 2
2 IFU Link Manager software 2
3 Laptop with IFU Link Manager installed 2
4 SONET test set 2
5 Digital multimeter (measures DC voltage up to 100V,
accuracy 0.3% or better)
2
6 BNC-banana interface cable 1
7 Site engineering folder 1
8 9/16 in. wrenches or sockets 2
9 Optical alignment tool 1