Installation Manual
Table Of Contents
- Contents
- List of Figures
- List of Tables
- About This Book
- Warnings and Safety Guidelines
- Avertissements et consignes de sécurité
- Conventions
- Risque de lésions corporelles provoquées par la décharge électrique
- Risque de lésions corporelles provoquées par les câbles à fibres optiques
- Risque de lésions corporelles provoquées par l’exposition de l’énergie radiofréquences
- Autres risques des lésions corporelles
- Risque d’interruption de service
- Autres mises en garde
- Installation Overview
- Staging Procedure
- Installation Procedures
- Alignment Procedures
- Removing an IFU
- IFU Test Results
- Invisible Fiber™ Product Glossary
- Index
index-2 © 1999 Triton Network Systems, Inc. All Rights Reserved.
D
danger
fiber optics
xvi
high current hazard
xvi
high voltage hazard
xvi
demarcation panel
connections
3-18
jumper inputs
3-19
E
earth ground 1-3
electrical shock warnings
xvi
convention
xv
engineering folder
1-1
F
far-end IFU
defined
3-25
test
4-10
results form
A-2
FCC RF safety requirement
3-7
fiber optic cable
1-2, 1-3
cleaning procedure
3-22
configuration
1-4
continuity test
3-21–3-25
results form
A-2
installing
3-16
testing procedure
3-24
fiber optic warnings
xvi
convention
xv
G
gounding system
earth ground
1-3
I
IFU
aligning near-end
4-3
bracket
See bracket
commissioning
far-end
4-7
far-end test
4-10
far-end test results form
A-2
near-end test results form
A-3
determining mounting location
3-5
FCC RF safety
3-7
installing
3-25
mounting
3-27
part number
2-2
pole setup
3-8
power termination
wiring diagram
3-11
removing from bracket
5-4
requirement for mounting on roof
pole mount
3-5
wall mount
3-5
servicing
5-2
wall mount setup
3-7
IFU Link Manager
defined
1-2
for commissioning
4-2
installation
attaching cables to IFU
3-28
cable requirements
1-2
fiber optic cable
3-16
IFU
3-25
IFU components
3-3
alarm cable
3-13
fiber optic cable
3-16
power cable
3-9
overview
1-1
power cables
3-9
power source requirements
1-2
setup
3-2
J
jumper
demarcation box connections
3-20
inputs on demarcation panel
3-19
L
lifting guideline 2-3