Installation Manual

Table Of Contents
Configuring IFUs
28 GHz SONET OC-3 IFU Installation - R1.0 2-7
14 Connect a laptop computer to the IFU as shown in Figure 2-4.
15 Enter the site attributes from the site database into the IFU Link Manager
program.
NOTE: Refer to IFU Link Manager help screens to enter the
required site database attributes.
16 Power down the IFU and remove the cables.
NOTE: If the staging site and the installation site are the
same place, continue with Chapter 3, Installation Procedures.
17 Confirm that the correct installation address is on the packing box and the
packing box label matches the IFU data plate, located on the back of the
IFU.
18 Use the original packing material to ship the IFU to the installation site.
Should the packing material not be available, contact Triton Network
Systems (see Contacting Triton Network Systems, Inc. on page xiii) for
packing instructions.