Installation Manual

Table Of Contents
Commissioning Procedures
4-2 © 1999 Triton Network Systems, Inc. All Rights Reserved.
CONFIDENTIAL & PROPRIETARY
D
O
N
O
T
C
O
P
Y
Setup
Before Starting
Before starting the procedures in this chapter, ensure that the IFUs have been
mounted at the near-end site and far-end site, and that the cables have been
tested.
Preparing for Installation
Table 4-1 identifies the basic commissioning tools required for
commissioning the near-end and far-end sites.
Table 4-1. Site Commissioning Tools
Item
No.
Description Qty.
1 IFU Link Manager test cable 2
2 IFU Link Manager software 2
3 Hub (10BaseT) 1
4 Laptop with IFU Link Manager and SmartApplication
software installed
2
5SmartBits (SB-200) test set 2
6 100BaseT to 100BaseFX media converters 2
7 10BaseT cable (CAT-5) 4
8 SC-to-SC couplers 2
9 MT-RJ to SC fiber adapters (MT-RJ SC) 2
10 Digital multimeter (measures DC voltage up to 100V,
accuracy, 0.3% or better)
2
11 BNC/banana interface cable 1
12 Site engineering folder 1