User Manual

4
4
3
step
step
B/D
E
Insert slots of Side Panel B
into pins of Bottom Panel A.
Secure the panels using 2 M6
screws E.
1
2
Align the Vertical Mounting
Rail’s holes with the cage nuts.
Secure the Vertical Mounting
Rails D to the Side Panels using
2 M6 cup washers G and 2 M6
screws E. Make sure both Vertical
Mounting Rails are aligned.
Note: We recommend installing the
Vertical Mounting Rails with its square
holes facing front. If you choose to install
them with the threaded holes facing front,
use the M6 screws to install the rails, as
stated above, and the included 12-24
screws to mount equipment to the rails.
GD
E
4
2 4
15-09-353-933500.indb 4 12/1/2015 11:11:03 AM