Owner`s manual
6
Enclosure Installation
Leveling
WARNING: Level the enclosure before attempting to install equipment. The casters are not designed to provide long-term support for the enclosure. Use the
levelers to provide long-term support. Install the enclosure in a structurally sound area with a level floor that is able to bear the weight of the enclosure, all
equipment that will be installed in the enclosure and any other enclosures and/or equipment that will be installed nearby.
1
Aftertheenclosurehasbeenmovedtotheinstallationlocation,useacarpenter'sleveltochecktheslopeof
the floor. If the floor slopes more than 1%, choose an alternate installation site.
2
Usean18mmopen-endwrenchtolowereachleveler
A
untilitreachesthefloor.(Thereare4levelers,
2atthefrontand2attherear.)Makesureeachlevelercontactsthefloorsolidly.Note: Lower a leveler by
turning it clockwise; raise a leveler by turning it counter-clockwise.
3
Afterloweringeachleveler,usethecarpenter'sleveltoconfirmthattheenclosureislevelinalldirections.
Adjustthelevelersasrequireduntiltheenclosureislevel.
4
(Optional)Ifyouwishtoprovideanadditionalmeasureofstability,youcanattachthe2shippingbrackets,
usingthehardwarethatattachedtheenclosuretotheshippingpallet.Usea13mmopen-endwrenchto
connectthebracketstotheouter
A
or inner
B
bracketmountingpointsoftheenclosure.Attachthe
bracketstosecuremountingpointsinthefloorusinguser-suppliedhardwareorTrippLite'sSmartRack
Bolt-DownKit(Part#SR331).
Ground Connection
Allthepartsoftheenclosurearegroundedtotheframeoftheenclosure.Usetheenclosure'sfrontorrear
threaded grounding point
A
andanM6screw(included)toconnecttheframeoftheenclosuredirectlytoyour
facility'searthgroundconnectionwithan8AWG(3.264mm)wire.Routethegroundwireundertheenclosure's
frame to ensure unhindered door operation. WARNING: Attach each enclosure to earth ground separately.
Do not use the enclosure without an earth ground connection.
EARTH
GROUND
FLOOR
1
2
3
A
B
4
A
A
201112001_L 93-2723.indd 6 12/14/2011 11:27:18 AM










