Installation Guide
Notice: The contents of this document are proprietary and confidential and the property of Trilliant Holdings Inc., its subsidiaries, affiliates, and/or
licensors. This document is provided subject to the confidentiality obligations set forth in the agreement between your company and Trilliant. The contents
may not be used or disclosed without the express written consent of Trilliant.
43
Installation Guide for SecureMesh WAN
®
Gateway 2 - PL-0073A
Chapter 5. Commission the gateway
This chapter provides the steps to connect power to the GATE-2000 and prepare it for
normal operation.
LED indicators
The GATE-2000 has four multi-colored LEDs on the enclosure base. When the GATE-
2000 is powered up by the PSE, a power-on sequence starts automatically.
The STATUS, LAN, WAN, and RSSI LEDs change color as the GATE-2000 progress
through the boot up sequence. The boot up sequence can take up to 120 seconds.
Figure 27: LED faceplate
When power is first applied, the STATUS, LAN, WAN, and RSSI LEDs are all
illuminated white for about one second. Then, one at a time in sequence, the LEDs
change from white to blue. After all the LEDs are blue, they change one at a time in
sequence to green. Once the GATE-2000 has fully booted, the STATUS LED should
be illuminated in green.
Note: At this time, the LAN, WAN, and RSSI LEDs might be on or off,
depending on the functional state of the GATE-2000.
As the GATE-2000 searches for a neighboring SecureMesh relay node, the WAN and
RSSI LEDs begin to flash, and may change color.