Installation Guide
Notice: The contents of this document are proprietary and confidential and the property of Trilliant Holdings Inc., its subsidiaries, affiliates, and/or
licensors. This document is provided subject to the confidentiality obligations set forth in the agreement between your company and Trilliant. The contents
may not be used or disclosed without the express written consent of Trilliant.
41
Installation Guide for SecureMesh WAN
®
Gateway 2 - PL-0073A
4. Adjust the three bolts until the bracket is level.
5. Place the vertical mounting pole through both center holes (see Figure 25).
Figure 25: Nut and washers on mounting pole; extension arm, and leveling
bracket
6. Secure the GATE-2000 mounting pole with washers and a nut.
7. Attach the GATE-2000 to the vertical pole using the pole clamp mount and
bracket, and follow the steps in Chapter 3, Preparing the surge suppressor.