User Manual
SkyPilot SkyAccess DualBand Installation 45
Use of an antioxide compound and proper sealing is essential. For
protection against corrosion, wrap all connections with Scotch® 130C
tape.
Checking Cold-Water Pipe Integrity
If you’re using a cold-water pipe for grounding, verify the integrity of
the ground. In some cases, sections of metal cold-water pipes may have
been repaired or extended with PVC material. PVC material or a
dielectric union will render a cold-water pipe ground unacceptable for
grounding.
Measuring Resistance
Verify that there is no more than 5 ohms of resistance between any two
ground points in the entire system. Also make sure that all ground
points on a structure are tied together. For example, if you use a
ground rod and a cold-water pipe as grounding points at different
locations on the same structure, you must tie them together.
Adding Surge Protection
If you’re installing a SkyPilot device in an area that’s subject to
lightning storms, SkyPilot recommends installing a surge protection
device (SPD) at both ends of the Ethernet cable - one at the SkyPilot
device and one at the point of entry to a building or enclosure.
SkyPilot offers SPDs with bracket and cabling designed for use with
SkyPilot equipment. For more information, visit SkyPilot customer
support at www.skypilot.com/support/
to view accessory guides for
SkyPilot-branded surge protection solution. (You may also purchase
SPDs from third-party vendors.)