User Manual
SkyPilot SkyAccess DualBand Installation 19
4 Attach tie wraps to the neck of the weather gasket and tighten them
so that they slightly depress the neck.
Figure 5. Attaching tie wraps to the gasket neck
The tie wraps provide relief from cable strain and ensure a fully
weatherproof seal.
Powering on the SkyAccess DualBand
Prior to mounting the SkyAccess DualBand, power on the unit to use the
onboard LEDs to facilitate optimal placement.
1 Connect the SkyAccess DualBand to the power supply, as follows:
a. Plug the AC adapter into an AC outlet.
b. Connect the Ethernet cable to the port labeled “CPE” on the
power injector.
c. Plug the AC adapter into the power injector.
5 GHz