The site survey should include an RF scan to identify available
frequencies. Check the preferred frequency at all locations; a frequency
that’s clear at one location may be crowded at another. Frequency
planning is a critical factor in planning and implementing a wireless mesh
network.
The site survey process should be ongoing. To verify that a site is
relatively free of interference, site audits should occur every 6 to 12
months, scheduling regular maintenance visits to coincide with the site
audits.
Cabling the SkyAccess DualBand
Ethernet cabling provides both power and data connectivity for the
SkyAccess DualBand.
The section provides instructions for attaching CAT5 cable to the device.
1 Terminate the appropriate grade and length of CAT5 cable with an
RJ-45 connector and plug it into the RJ-45 port on the back of the
SkyAccess DualBand.