User Guide

Access Point Deployment Guide 71
NOTICE: The contents of this document are proprietary and confidential and the property of Trilliant Holdings, Inc., its subsidiaries, affiliates, and/or licensors. This
document is provided subject to the confidentiality obligations set forth in the agreement between your company and Trilliant. The contents may not be used or disclosed
without the express written consent of Trilliant.
D
Base Station Configuration
Table 15. TRN Base Station Configuration Options
Base Station Option
Description
Applications
Required Hardware
Additional Items Required
TRN-1011 Base
Station
Outdoor base station
120/240 VAC powered
system with 8 hours of
battery backup
AP is located in the
equipment cabinet along
with a 3G modem and
battery backup
Outdoor locations with AC
power requiring 3G modem
backhaul.
For example:
Communication sites
Transmission Towers
Wood distribution poles
Outdoor Wall mount
Access Point
Outdoor equipment cabinet powered by
120/240 VAC and contains:
o One Integrated GPS antenna
o One 3G modem
o Two integrated 3G modem antennas
o Antenna surge suppressor
o Backup battery
o Alarm monitor
9 dBi AP antenna
Customer-supplied 3G
Digi modem (U805)
Site-specific cable for the
AP antenna
Site-specific installation
hardware