User Guide

Access Point Deployment Guide 15
NOTICE: The contents of this document are proprietary and confidential and the property of Trilliant Holdings, Inc.,
its subsidiaries, affiliates, and/or licensors. This document is provided subject to the confidentiality obligations set
forth in the agreement between your company and Trilliant. The contents may not be used or disclosed without the
express written consent of Trilliant.
Installation Prerequisites
and Considerations
Before starting the actual physical installation of an AP, it is very important to complete the
prerequisite tasks outlined in this chapter as well as take into account the installation
considerations indicated. Information gathering templates are provided in the appendices of this
document.
Installation Prerequisites
Site Survey
A site survey should be conducted prior to installation for all AP sites. The site survey provides
detailed, site-specific, information required to plan an AP installation and should be documented.
See Error! Reference source not found. on page Error! Bookmark not defined. for a Site
Survey Worksheet template. A copy of this worksheet should be provided to the installer.
A site survey provides:
Site name
AP antenna mounting location and height
AP ID
Antenna line length required
Site street address or other location
GPS antenna mounting location
Site access information
GPS antenna cable length