User manual
16
Extraction
The charcoal fi lter is not required in this mode 
and should be removed. 
Ducting
The ducting used must be Ø150mm (6ins), or 
Ø125mm (5ins) in diameter. 
If possible duct through the wall immediately 
above the hood body. 
For the best performance use the shortest 
possible duct run and the minimum number of 
bends. 
Where fl exible ducting is fi tted it should not be 
turned through very tight bends as this may 
impair the performance of the hood. 
It is recommenmded a maximum length of 3 
metres, to be installed, to be reduced 1 metre for 
each 90
o
 bend installed in the ducting run. 
If the distance is greater than 3 metres the 
effi cency of the hood could be impaired.
The diameter of the ducting spigot on the top of 
the hood body item 1 is Ø150mm (6”). 
When using Ø125mm (5”) ducting it will be 
necessary to install the ducting adapter item 9 
to the Ø150mm (6”) outlet on the top of the hood 
body and the Ø120mm to 125mm ducting collar 
item 10 (supplied).
  If the room where the cooker hood is to 
be used contains a fuel burning appliance 
such as a central heating boiler, then 
its fl ue must be of the room sealed or 
balanced fl ue type.
  If other types of fl ue or appliances are 
fi tted ensure that there is an adequate 
supply of air to the room.
  The cooker ducting (extraction mode) 
must never be connected to central 
heating fl ues, radiators or water heaters 
etc. 
  Electrical Connection and Working 
Test
Before fi tting the chimney to the canopy make the 
electrical connection as described in the section 
titled “ELECTRICAL CONNECTION”.
When the electrical connection has been made, 
test the three speed fan and worktop illumination. 
9
ø 150
ø 125
10
INSTALLING THE COOKER HOOD










