Install Instructions
PRESTIGE TriMax Control
and/or Display Module Replacement
5
13. Mount the new Trimax Display Module into the
enclosure using existing screws. Tighten all
(6) screws properly to secure the Display
Module.
14. Reconnect remaining Molex connectors in the
proper positions. Connectors are designed to fit
only into its respective mating connector.
Installation of Trimax Control Module
15. Mount the Trimax Control Module into the
enclosure by positioning the board onto the pro-
truding pins.
16. Use existing mounting screws to secure the
Control Module.
17. Reconnect the 8 Molex connectors to proper
positions as shown in Fig. 5. Each connector is
designed to fit only in its respective mating
connector.
18. Reconnect ignition cable onto the Control
Module ignition connector.
19. Place the rear cover in place and lock in the top
retaining tabs.
20. Tilt control panel assembly upward and lock
sliding tabs in place.
21. Remount the front jacket panel to the boiler.
22. Turn power to the unit “ON” and return the
boiler to service.
23. Return to page 2 and enter settings recorded in
Table 1 back into the Trimax control.
Prestige Excellence units require setting Prestige
Model to Excellence and DHW Demand Type to
Sensor.
If the Prestige is in a Cascade System, Cascade
Autodetection must be performed after replac-
ing a Control or Display Module.
NOTICE
NOTICE
1
2
3
4
5
6
Fig. 7. Display Module Mounting
Prestige_TriMax_Control_Display_Module_DCR639 1/14/14 9:45 AM Page 5