Prestige Stainless Steel Vent Termination Kit Instructions

Prestige Gas Vent Stainless
Termination Kit
3
the support bands on the interior plate to sup-
port the piping. See Figure 2 and Figure 3.
6. Mount the exterior back plate over the protrud-
ing vent and air intake piping. Use the supplied
#10 x 1” mounting screws to secure the plate to
the exterior face of the building as shown in
Figure 3.
7. Apply a bead of high temp silicone (RTV)
around the vent and air intake piping where it
penetrates through the exterior back plate as
shown in Figure 3.
8. Apply a generous bead of high temperature sil-
icone (RTV) along the outside circumference of
the vent pipe as shown in Figure 3.
9. Install the termination screening onto the exteri-
or back plate as shown in Figure 4. Using a
slight twisting motion install the termination
faceplate with the vent pipe inserted into the
vent coupling.
10. Using the mounting screws removed in STEP 1,
secure the termination faceplate to the exterior
back plate.
Support
Band
Interior Plate
M
ounting Screw Location
(4 places Type)
Fig. 2: Mounting of Interior Plate
Mounting
Screw Location
(4 places Type)
Apply Bead of
High Tempe-
rature Silicone
(RTV) Along
Outside Sur-
face of Vent
Pipe
Apply Bead of
High Temp. Silicone
Along Penetration
Exterior
Black Plate
2
"
1
"
A
i
r
In
t
a
k
e
E
x
t
e
n
s
i
o
n
V
e
n
t
P
i
p
e
E
x
t
e
n
s
i
on
Fig. 3: Mounting of Exterior Back Plate