Prestige ACVMax Control Supplement

41
7.0 Cascade
1. Remove the white plastic cover from the sensor
2. Cut a small slit in the gasket seal on the end of the sensor.
3. Route 18 AWG 2-wire cable or similar cable through the seal gas-
ket into the enclosure.
4. Push down on the orange wire terminal retainers to insert the
wires into the sensor terminals. Release the orange wire terminal
retainers and confirm that the wires are firmly attached to the sen-
sor terminals.
5. Select a location for the sensor on the common supply header
downstream of all boilers in the system. Clean the pipe with fine
sandpaper or emery cloth to ensure the pipe is clean and sensor
will make good contact with the pipe.
6. Press the white cover onto the sensor and strap the sensor to the
pipe using the included wire tie.
7. Wire the sensor to terminals 3 & 4 of X5 on the control module
of the Master boiler.
7.3.3 Cascade Communication Cable
A communication cable PACAB01 must be installed between each
boiler in the Cascade System. The cable has a 4 pin molex connec-
tor on one end and a 6 pin molex connector on the other end. The 4
pin molex connector plugs into the Cascade Master X16 connector
on the control module of the Master boiler or prior Slave boiler in
cascades of three or more boilers. The 6 pin molex connector plugs
into the Cascade Slave connector of the Slave boiler. Reference
Figures 22, 24 and 26 on pages 45, 47 and 49 for wiring details.
7.3.4 Low Voltage Wiring Connections
Thermostat Wiring CH1 and CH2 calls must be wired into the
Cascade Master.
Outdoor Sensor Wiring The outdoor temperature sensor must be
wired into the Cascade Master.
Domestic Hot Water Wiring A DHW call must be wired into the
Cascade Master.
Additional Boiler Limits Boiler Limits must be wired into each
boiler in the Cascade System. When a boiler limit opens, that par-
ticular boiler will lockout and will be removed from Cascade System
operation. The other boilers in the Cascade System will continue to
operate if they are not in a lockout.
External Modulation Control An External Modulation Signal must be
wired into the Cascade Master. The modulation signal will control the
firing rate of the entire Cascade System, not just the Cascade Master.
Modbus Wiring – A building management system (BMS) connection
must be wired into the Cascade Master to obtain cascade system and
Master boiler information.