Install Instructions
Pre-Installation Items
3
3
3 1/4” [84.5 cm]
Face of Wall
Top of Boiler
6 3/4”
[17.1 cm]
7
”
[17.8 cm]
Fig. 2: Assembled Vent/Air System Kit Dimensions
Fig. 3: Optional Vent/Air System Components
Clamp Hanging
CCVCLP01
Clamp
CCVCLP02
(Repair Part Only)
Adjustable Length
with Clamp
(10.8” to 15.5”)
[27.3 cm to 39.4 cm]
CCVPIP03
Pipe - 19.7” [50 cm]
Cutable with Clamp
CCVPIP04
Elbow - 90º
with Clamp
CCVELB01
Elbow - 45º
with Clamp
CCVELB02
Pipe - 39” [1 M]
Fixed with Clamp
CCVPIP01
Pipe - 79” [2 M]
Fixed with Clamp
CCVPIP02
PSVPIP02
Fire Stop Support
CCVSUP01
Inner Pipe Gasket
Not Shown
CCGSK01
(Repair Part Only)
PSVGSK01
Vertical Termination
with Clamp
Not Shown
CCVTERM01
Roof Flashing
0º - 25º Pitch
Not Shown
CCVFLA01
Roof Flashing
25º - 45º Pitch
Not Shown
CCVFLA02
Roof Flashing
Flat 0º Pitch
Not Shown
CCVFLA03