Installation & Assembly
1. 
11/16” wrench. 
2. 
3. 
4.  Due to weather and temperature changes periodic hinge adjustment may be necessary to as-
1.  36” from the ground (or to de-
sired height) using the supplied 1 1/2” self-drilling screws. The latch should be ori-
ented so the catch is on the gate-swing side of the post. The catch will face up or 
2.  Using the supplied 1 1/2” self-
to the gate pane lining the strik-
er rod up with the catch on the 
post latch. 
3. 
gate panel upright using the sup-
plied 1” self-drilling screws. Han-
3/4” 
from the edge of the gate panel. 
The height must be staggered. 
Step 4: Make any Final Adjustments 
T
18
Fence Distributors










