Installation Guide

141
TREX
®
SIGNATURE RAILING
21. Using the slot on the HZ template, locate marked
line and drill two 7/64" pilot holes at each mark (or
mark with a punch).
NOTE:
Pilot holes will be drilled out larger in next step.
22. Using pilot holes
(or marks), drill 5/16"
holes for all vertical
supports in both top
and bottom rails.
Installing Top and Bottom Rails
23. Install lowest end vertical and all intermediate
verticals to bottom rail using ST Wedge Spacer and
screws provided.
24. Slide rods into lower end and all intermediate
verticals.
NOTE:
When inserting rods into intermediate supports,
keep rods straight to avoid scratching.
25. Slide upper end vertical onto rods and attach to
bottom rail using ST Wedge Spacer and screws
provided.
26. Using a mallet, install bottom rail cover onto
bottom rail.
27. Install top rail to all vertical and end supports using
ST Wedge Spacer and screws provided.
21
2
1
22
1
1
23
1
2
24
1
1
1
1
25
2
26
27
2
1
1
1
HOW TO INSTALL HORIZONTAL ROD RAILING STAIRS/CONTINUED
TREX
®
SIGNATURE
STANDARD