Installation Guide

133
TREX
®
SIGNATURE RAILING
HOW TO INSTALL HORIZONTAL ROD RAILING/CONTINUED
TREX
®
SIGNATURE
STANDARD
4. Measure distance between posts (X), and subtract
1/2" for bracket clearance.
If installing crossover post configurations adjust top
rail length
:
X + 3/4" if using one crossover post, or
X + 1-1/2" if using two crossover posts.
If using swivel brackets, measure distance between
brackets and cut railings to this distance.
Cutting Railings and Covers
5. Cut both bottom and top rail to length as determined
above.
6. Mark and cut bottom rail cover 1-1/2"
(3.8 cm) shorter than bottom rail.
7. Mark and cut top rail cover same length as top rail
for all top rail configurations.
Locating Vertical Holes on Bottom and Top Rails
8. Place HZ template at end of top and bottom rails.
Pre-drill pilot holes (using a 7/64" bit or small punch)
at locations.
NOTES:
» Template is labeled for the type of bracket used.
» Pilot holes will be drilled out larger in a later step.
» For Compound Swivel Brackets, set the rail in the
bracket and mark 3.75" from the post.
6' Rail Spans or Shorter
9a. Measure the distance between the vertical end holes
on both top and bottom rails. Mark the center.
IMPORTANT NOTE: DO NOT mark the line across the
entire width of the bottom rail, as it will be visible after
install. Maximum recommended line width is 1".
5
KEY
Mark
Cut
KEY
4
X- 1/2"
1-1/2"
(3.8 cm)
1-1/2"
(3.8 cm)
6
Bottom rail
Bottom
rail cover
7
8
1
2
9a