Installation Guide

103
TREX
®
SIGNATURE RAILING
INSTALLATION OF HORIZONTAL SWIVEL RAILING/CONTINUED
TREX
®
SIGNATURE
STANDARD
Cutting Top Rail
Option 1:
For Post-to-Post Configuration
5a. Cut top rail to the measurement between the top
swivel brackets. For standard post-to-standard post
configurations this would be same dimensions as
that of the bottom rail.
Cutting Top Rail
Option 2:
For Post-to-Crossover Post Configuration
5b. When going from standard-post to crossover post,
measurement must be taken from inside of top
horizontal swivel bracket to inside lip of crossover
bracket (which is attached to top of crossover
post).
Cutting Top Rail Insert and Cover
6. Slide rail insert out and cut 3/4" (1.9 cm) FROM
EACH SIDE of insert, then slide back inside rail
and center.
7. Mark and cut top rail
cover same length as
top rail for all top rail
configurations.
8.
Attaching Center Baluster to Bottom Rail
See instructions on page 88 Post-to-Post or 92 Post-to-
Crossover Post.
9. Attaching Bottom Rail Cover and Bottom Rail to
Brackets
See instructions on page 88 Post-to-Post or 92 Post-to-
Crossover Post.
10. Installing Remaining Balusters into Bottom Rail
See instructions on page 89 Post-to-Post or 92 Post-to-
Crossover Post.
11. Attach Upper Railings
S
ee instructions on page 89 Post-to-Post or 93 Post-to-
Crossover Post.
12. Attachment of Bracket Covers, Skirts, and Caps
See instructions on page 90 Post-to-Post or 94 Post-to-
Crossover Post.
13. Attachment of Foot Block
See instructions on page 104.
5a
1/4"
(0.6 cm)
1/4"
(0.6 cm)
1/4"
(0.6 cm)
1/4"
(0.6 cm)
KEY
Mark
Cut
KEY
Top rail
Standard post
Standard post
5b
Crossover
post
Standard
post
6
3/4 "
(1.9 cm)
3/4 "
(1.9 cm)
3/4 "
(1.9 cm)
3/4 "
(1.9 cm)
Top rail
7