Installation Guide
1. PREP 
Apply blocking mid-span between joists. Block-
ing should be angled back to leave a minimum of 2 
½”-3” from the top of the joist. Turn blocking around 
so screws do not puncture trough. (This blocking 
method only applies when using Trex® RainEscape®, 
for blocking instructions for a standard Trex Eleva-
tions™ see instructions for Elevations.)
 Please note: To properly install the Trex RainEscape 
system over the Trex Elevations system requires a 
minimum of 2 people.
ANGLE BACK SPAN
2 
1
/2” - 3” 
INSTALL SPAN UPSIDE DOWN
TO AVOID SCREWS PUNCTURING 
THE TROUGH
CUT 3” -6” STRIPS OF DOUBLE SIDED TREX RAINESCAPE 
TAPE AND PLACE EVERY 16” TO 20” ALONG THE JOIST & 
PERIMETER, LEAVING BACKING ON
REMOVE TAPE BACKING AND PLACE DOWNSPOUTS INTO THE JOIST BAY
CUT DOWNSPOUT 
THROUGH THE BACK
TOP TO BOTTOM
ADJUST SIZE AND STAPLE
TO THE BACK OF THE BAY
TAPE SEAM
TOP TO BOTTOM
INSTALLATION USING THE TREX ELEVATIONS™ SYSTEM
ELEVATIONS SYSTEM
9
3. DOWNSPOUTS
» Remove the backing on the double sided tape and 
place the downspout in the joist bay.
» Repeat the process the same as you would in a 
standard Trex RainEscape installation.
2
2. TAPE AROUND JOIST AND PERIMETER
» Cut 3”-6” strips of the Trex RainEscape double 
sided tape and place every 16” - 20” along the joists 
and perimeter leaving backing on.
3
4. TROUGHS
» Remove the backing on the double sided tape on 
one side of the joist and place the first side of the 
trough as you would in a standard installation.
» Place new strips of the Trex RainEscape double 
sided tape along the top of the adjoining trough and 
install as you would in a standard installation. (4A)
4
REMOVE TAPE BACKING AND PLACE THE TROUGH
IN THE JOIST BAY AS YOU WOULD IN A STANDARD
INSTALLATION
4A
ADD NEW TAPE TO 
THE TOP OF THE 
INSTALLED TROUGH 
AND PLACE SECOND 
TROUGH. REPEAT THE 
PROCESS FOR ALL 
REMAINING TROUGHS
SEALING THE 
SYSTEM
»  Tape the finished 
system as you 
would in a stan-
dard installation.
1










