Installation Guide
Fence Distributors
8
TM
1. elow the top of the post to one side
of each post using two screws (see Fig.4).
2. Set the uphill post st. This post should be set at 76 3/4” tall with the bracket
facing to the next post down hill. Plumb and level the post to the string line.
Fill the hole around the post with concrete mix (see Fig. 4).
3. Place the next downhill post in its hole with the bracket facing uphill towards the
last post that you set. Place a horizontal rail onto the brackets of the two posts
and place a level on the rail. Adjust the post height of the downhill post
Plum
b and level the post and ll the hole around the post with concrete mix.
30” Min. Typ.
Consult local
conditions and
codes for post
depth
12”
76 3/4”
3 3/4”
Fig. 4
Fig. 5
4B
the rail is level (see Fig. 5). This will also ensure that posts are spaced correctly.