Installation Guide

7
Fence Distributors
7
TM

If posts will be set on sloping or uneven grou or will be stepping skip to step 4B.
1. two screws (3 3/4” below the
top of each post). End posts will only have one bracket that faces
two sides (see Fig.3)
.
2. Set the rst post in the hole. Plumb and level the post to the string
line (ensure that the post is 76 3/4” high*) and ll the hole around
the post with concrete mix.
3. Place post into the next hole. Place a horizontal rail onto the
brackets. Use a level on
the rail and raise or lower
the previous post. This rail
will also ensure that your
posts are spaced correctly
(see Fig.3). Plumb and level
the post to the string line and
l the hole around the post
with concrete mix.
4.
all posts are set.
3 3/4”
Fig. 3
A


30” Min. Typ.
Consult local
conditions and
codes for post
depth
Fig. 2
76 3/4”