Installation Guide
 9 
Fence Distributors
9
TM
4. 
pos and subtract this from the height of the rail on the rst post. Add this 
measurement to 3 3/4” and this will be the placement of the downhill bracket 
(see Fig. 6).
8 5/8”
 
1.  etween
(see Fig. 7). Touch up the cut end using a zinc rich primer and a matching top
 coat to help prevent rust.   
Fig 6 
5.
5: Cut Horizontal Rails 
Be sure to cut only one end of the rails 
79 3/8”
-74 1/2”
5 1/8”
+3 3/4”
8 5/8”
Fig 7
to cut the horizontal rails for length. Measure between the posts and cut










