Installation Guide
Fence Distributors
17
tep 2: Install tate Panel
A. Using a 3/8” 6”
1/2” self-drilling
screws. Pre-drilling with a 3/16”
B. Place the gate panels in the opening. Adjust the gates so the top rail lines
up with the top rail of the fence.
C. Using the supplied 1 1/2” self-
the outside corner of each hinge to the gate post con-
-drilling with a 3/16” drill
D.
the hinge bracket to the hinge post.
A
B
C
D
TM