Installation Guide

1. -
only one panel is in use) approximately 36” from the ground (or to desired height)
using the supplied 1 1/2” self-drilling screws. The latch should be oriented so the
catch is on the gate-swing side of the post. The catch will face up or down depend-
2. Using the supplied 1 1/2” self-
the gate pane lining the striker rod
up with the catch on the post latch.
3.
panel upright using the supplied 1”
self-drilling screws. Handles should
3/4” from the edge of
the gate panel. The height must be
staggered.
1.
11/16” wrench.
2.
3.
4. Due to weather and temperature changes periodic hinge adjustment may be necessary to as-
Step 4: Make Any Final Adjustments
T
22
Fence Distributors
