Table of Contents 1 English 1. Before You Start 2, Quick Reference 3. Hardware Installation 4. Hardware Configuration 5. Additional Information 6.
3. Hardware Installation Nos: g The maximum amount of power available Is 30 Watts per port and 240 Watts total, If a power overload has occurred, the switch will prioritize the distribution of power by port (from lowest to highest. That s, port 1 il receive the highest priority and port 3 wll receive the lowest priority. The ports with lower priority will have fts PoE function disabled until more than 7.5 wafts of power becomes available.
3. Rotas the TI-PG12841 downward towards the tall to lock It Into claps. You will know It Is scours when you hear a click. L 4. To remove the unit, pull down to clear the bottom of the DIN-All and rotate away from the tall. Applying Power 1. Connect the prows supply (sold separately) 1o the Included terminal block (2s shown below} and secure with the screws. ‘Hot: Polarities must match. 2. Attach the terminal block to the unit.
Optional: The switch chassis can also be connected o a known grounding point for editorial g safety and protract (grounding wire s not Included). »Tum off the power before connecting any modules or wire. The comet power supply voltage (48— 57V DG} Is listed on tha product label. Heck the voltage of your power source o mask sure that you are using the comet part. Do NOT use voltage greater than 48 57V DC, a5 specified on the product label.
4. Hardware Configuration 2. Assign a Static IP madrassas to your computer's network adapter In the subset of 192.168.10.x (6. 192.168.10.25) and a subset mask of 255.255.255.0, 3. Open your weh browser, type the IP address of the switch in the address bar, and then press Enter. The default P address is 192.168.10.200 4. Enter the User name and Password, and then click Lenin. By default: User Name: admin Password: admin Muse: Lister Nam and Password are sacs sensitive.
5. Click Basic Settings and then click General Settings. 7. Click Save. 8. Connect a network source and devices to the switch. Check the LED to confirm the ‘connections are established. Your Installation Is complete.
5. Additional Information 1. Redundant power inputs L3 o] Terminal Block Redundant Prows Input: “Terminal Block (PW” as primary power and "Terminal Block (RPS)” for secondary power source, to be a redundant power Input. 2.
Declaration of Conformity TREND NET Manufacturer’s Name snd Address Trend net, Inc. 20675 Manhattan Place Torrance, CAS0501 USA sequestration 156 2587 WB The Hague The Netherlands Product Information: Model Number: TI-PG12841 Product Name: Trade Name: Trend net hereby declaws that the product Is In compliance with the essential requirements and other relevant provisions under our sole responsibility.