1. Before You Start Package Contents +TI-PES0 / THESPIS »Quick Installation Guide ~Removable terminal block +DIN-rail mount Wl mount kit Minimum Requirements: « Existing network +Power Supply {T-512048 or TI-524048) 2.
3. Hardware Installation The switch can be placed on a desktop, wall, or mounted to a DIN-All. Din-Rall Mounting Instructions 1. Almach the DIN-rail mount bracket to the swill. 2. Population the unit In front of the DIN-All and hook the mount bracket over the top of the tall. 3. Rotate the flier converter downward towards the tall to lock it Into claps. You will know fits secure when you hear the click. N s 4.To remove the unit, pull down 1o clear the bottom of the DIN-All and rotas up, away from the rail.
Wall Mounting Instructions 1. Attach the wall mount plates to switch. 2, Mount the switch. «Tum off the power before connecting any modules or wire. The correct prows supply voltage (48 56V DC} is listed on the product label. Check the voltage of your power source to make sure that you are using the correct part. Do NOT use voltage greater than 48 56V DC, the product label. » Calculate the maximum possible current in each power wire and common wire.
Appalling Over 1. Connect the power supply (sold separately} to the included terminal block (as shown below) and secure with the screws. Note: Polarities must match. 2. Attach the terminal block to the unit, connect the neutral wire to the ground, and supply power o the power adapter. TI-PEG Connect a network source and devices to the switch. Check the LESS to confirm the connections are established. Your installation Is complicated.
Declaration of Conformity TREND NET Manufacturer’s Name snd Address ‘Trend net, Inc. 20675 Manhattan Place Torrance, CA 90501 USA sequestration 156 2587 WB ‘The Hague The Netherlands Product Information Model Number: Product Name: 5-Port Industrial Fast Ethernet Poet DIN-Rail Switch 8-Port Industrial Fast Ethernet Poet DIN-Rail Switch Trade Nam Trend net Trendier hereby declare that the product i in compliance with the essential requirements and either relevant provisions under our eels responsibility.