a) b) c) d) e) f) a Wall Tile Shower Pan Liquid Membrane Crack Isolation Tape Concrete b d c f e adjustable fusion shower pan recessed into concrete installation guide www.TrendingAccessibility.
Installation Guide 2 for adjustable fusion shower pan recessed into concrete Required Components b) c) f) e) d) a) b) c) d) e) f) Adjustable Fusion Shower Pan Tile Drain Liquid Waterproofing One Roll Rubberized Crack Isolation Tape 2 - Inside corners of Rubberized Crack Isolation Tape Gasket Membrane 15 - 2 1/2” screws 4 - 3/4” screws a) nt stme Adju 0° 36 Important: Do not install this kit without the appropriate waterproof‐membrane liners or coating.
Installation Guide 3 for adjustable fusion shower pan recessed into concrete Stainless Steel Grate Stainless Steel Drain Frame Height Extension Ring (5/8” - 1”) (Optional) - This must be fixed in place using solvent cement. Height Adjustment Ring (1/4” - 5/8” rotate counter-clockwise to increase height - This must be fixed in place using solvent cement.
Installation Guide 4 for adjustable fusion shower pan recessed into concrete Step 1 > > > > > > > > > For optimal performance, it is imperative there is a level surface prior to installation of a new Fusion Pan. Check existing floor to make sure it is level. If it is not, please correct prior to installation. Place the pan in desired location and mark the edge of the pan on the concrete. Note: If the Adjustable Fusion Pan needs to be trimmed, follow the guidlines on page 11.
Installation Guide 5 for adjustable fusion shower pan recessed into concrete Step 5 > > > > > > > > > Set the Fusion Pan into place, and check to make sure it is level. This is important to achieve proper drainage. If for some reason you notice any rocking or flexing in the pan, you may need to build up or shave areas.
Installation Guide 6 for adjustable fusion shower pan recessed into concrete Step 9 > > > > > > > > > The floor should be level with the Fusion Pan where they meet. Step 10 > > > > > > > > Check that the Fusion Pan is level on all four sides. Fill in any gaps around the perimeter of the pan over 1/8” with latex or acrylic caulk. Do not use 100% silicone. Gasket Clamp Step 11 > > > > > > > > > You now want to attach the Drain adapter flange to the Fusion Pan.
Installation Guide 7 for adjustable fusion shower pan recessed into concrete Step 13 > > > > > > > > Materials needed for wet room waterproofing. You will now begin waterproofing the wet room. BEST PRACTICE: To achieve the best results, we recommend waterproofing the whole room. Minimum requirements, shown in these instructions, show you that you only have to waterproof the shower zone, which is 6 ½ feet high and about 2 feet outside of the showering area.
Installation Guide 8 for adjustable fusion shower pan recessed into concrete Make sure the tape overlaps the seams equally. Step 17 > > > > > > > > Using the 5” crack isolation tape. Overlap all seams on either the floors or walls. Overlap the seam where the Fusion pan and concrete meet. Step 18 > > > > > > > > Using the provided precut piece of gasket membrane, slather area where gasket piece will adhered to the drain area.
Installation Guide 9 for adjustable fusion shower pan recessed into concrete Step 21 > > > > > > > > Apply two coats of liquid waterproofing to achieve 2 mils. (roughly the thickness of a credit card) Make sure that the “V” section of the gasket clamp is filled with the liquid waterproofing. Best Practice > > > > > To achieve the best results, we recommend waterproofing the whole room.
Installation Guide 10 for adjustable fusion shower pan recessed into concrete Step 24 > > > > > > > > You are now ready to tile. If you are using large format tiles, they must be cut diagonally and laid to follow the pitch in the Fusion Pan (From the corners of the grate frame to the corners of the Fusion Pan). Apply the tile adhesive, and lay the tiles in a regular pattern. Step 25 > > > > > > > > Once your tiling is complete. Grout the floors and walls.
Installation Guide 11 for adjustable fusion shower pan recessed into concrete Adjustable Fusion Shower Pan - Cutting and Drilling guideline Cutting and Drilling Guidlines Do not cut into central solid oval section Maxim um cut Maxim um cut Maxim um cut Maxim um cut Fig.1 Cut using an old or disposable handsaw. Additional timber F ig . 2 Cu t t o l e n g t h . Additional timber Additional timber F ig . 3 C u t t o a c c o m m o d a t e d ia g o n a l w a ll . Fig.