Instruction Manual
4
NETB/LINC Installation Instructions TG200632 Issue 1/C 15/11/06
NETB/LINC Installation Instructions
3.1 Installation - Mounting (Continued)
8
Connect LonWorks
S C N
S C N
T -
T +
R -
R +
T -
T +
R -
R +
N
E
L
~
2 3 0 V a c
T h i s u n i t m u s t b e e a r t h e d
L O N
J 1 8
J 8
J 7
J 6
J 1 6
F S I
L o n A
L o n B
S C N
L o n A
L o n B
S C N
T R E N D
N E T W O R K
5 0 / 6 0 H z
1 8 V A
S U P P L Y F U S E 5 0 m A ( T )
L I N C
T e r m i n a t o r
T e r m i n a t o r
T e r m i n a t o r
Star topology Bus topologyLoop topology
*
LonWorks
LonWorks
SCN
LonA
LonB
SCN
LonA
LonB
internal
links
polarity independent
Lon - FTT (free topology)
*
*
Do not allow wires to
cross on a loop
Normal current loop Lan cable is not recommended.
Do not use screened cable.
If used with LPT-10 (powered bus), cable
lengths differ - see "Link Power Transceiver
User's Guide" (078-0105-01C)".
Terminal size 0.5 to 2.55 m
2
(14 to 20 AWG)
Replace Side Covers
9
slide in
Switch off
1
O
I
Open Panel
2
NETB/LINC/FTT/24 only for UL rating
Note that if single segment, LONTERMINATOR can be used to terminate LonWorks bus.
If appropriate
The unit is UL rated, accessory to open
energy management equipment.
elbaChtgnelsubxaMedonotedonxaM
20158nedleB)sdy545(m005)sdy545(m005
dnerT
002/FH/61/0/1/PT
)1748nedleB(
)sdy545
(m005)sdy034(m004
GWA22,VIleveLLU)sdy545(m005)sdy034(m004
8.0x2x2Y)tS(YJ)sdy545(m005)sdy053(m023
GWA42,5.taCA
865AIT)sdy034(m054)sdy072(m052
* Terminate LonWorks bus at one end only using IQLROUTER integrated LonWorks
terminator or LONTERMINATOR
100
m
F, 50 V min
100
m
F, 50 V min
Terminator
e.g.
LONTERMINATOR
LonASCN LonB LonASCN LonB
LINC
A
1
IQLROUTER
2
3
4
B
1
2
3
4
IQL
x
y
A
1
IQLROUTER
2
3
4
B
1
2
3
4
z
w
LONC
IQL
x
yz
w
LonASCN LonB LonASCN LonB
LONC
LonASCN LonB LonASCN LonB
567 89 1011
45 67 891011
Maximum 64 nodes per LonWorks segment
Maximum 40 IQLs (and LONCs) per Lan
Recommend terminate at
LINC or Router.
e.g. use IQLRouter integral
terminators
replace screws
3.2 Installation - Configuration