4.2 Instructions for Installing Multiple Trapzilla Units Above-Ground
When installing multiple Trapzilla units in series, the change in elevation from the inlet to the outlet of a
unit requires that each preceding unit be installed 1” higher than the unit after it. For above-ground units,
pressure treated plywood may be placed fully beneath the support stand to create the height difference.
All installations inside of a building must have a vessel vent installed and piped
to atmosphere.
1
1
2
2
3
3
4
4
A A
B B
C C
D D
THIS DRAWING CONTAINS PROPRIETARY AND PATENTED MATERIAL. THIS DRAWING MAY NOT BE REPRODUCED IN WHOLE OR PART WITHOUT
WRITTEN CONSENT FROM THERMACO, INC. POSSESSION OF THIS DRAWING DOES NOT CONSTITUTE THE RIGHT TO MANUFACTURE.
POSSESSION OF THIS DRAWING DOES CONSTITUTE AN IMPLIED NONDISCLOSURE AGREEMENT BETWEEN THERMACO, INC. AND THE HOLDER OF
THIS DRAWING. DO NOT DESTROY THIS DRAWING, IT IS THE SO
LE PROPERTY OF THERMACO, INC. AND MUST BE RETURNED UPON REQUEST.
MATERIAL (UNLESS NOTED)
FINISH (UNLESS NOTED)
646 GREENSBORO STREET
PO BOX 2548, ASHEBORO, NC 27203
VOICE 336-629-4651 FAX 336-626-5739
Decimals
.XX +/- .03
.XXX +/- .015
Unless otherwise specified
Dimensions are in inches
Tolerances
Angular
+/- 1
°
CHECKED
SIZE
REV. NO.
DWG NO.
PART NO.
C
SCALE
RELEASE DATE
SHEET OF
ENGINEERING
DRAWN
DATE
THIRD ANG LE PROJECTIO N
TSS-95
TZ-600
SUPPORT STAND
SSOP-TSS-70/95
SUPPORT STAND
SSOP-TZ-400/600
2 WAY CLEAN OUT
(3 PLACES)
OUTLET VENT TO
FACILITY VENT TZ
UNIT ONLY
1" ELEVATION DIFFERENCE
(MINIMUM) BETWEEN TSS
AND TZ TO ENSURE FALL
BETWEEN UNITSAND TO
COMPENSATE FOR INLET/
OUTLET HEIGHT DIFFERENCES.
TZ-600-SSA TSS-95-SSA
5.0 In-Ground Installation Instructions
5.1 Plumbing Instructions for a Single Solids Separator Installed In-Ground
Trapzilla units may also be installed in the ground outside of the facility. For instances where the facility
drainage piping requires an extension collar that is no more than 18”, use the instructions for the full
TSS-95-ECA unit. If the unit is to be deeper in the ground, the ECA-TSS-29 Extension Collar Assembly
may be installed to align the Trapzilla inlet with the drainage piping. The ECA-TSS-29 may be trimmed
in the eld to t. Trim both the inner and outer portions of the extension collar to make shorter than
collapsed height. Thermaco, Inc. also recommends embedding the in-ground Trapzilla with concrete
to provide additional structural strength and to off set buoyancy effects. For Buoyancy Calculations &
suggested concrete ll quantities please see the following page. Use the full TSS-95-ECA for 0-18” of
collar needed or purchase separately the TSS-95 and ECA-TSS-29 for 5-29” of collar needed.
In-Ground Installations inside of a building must have a vessel vent installed and piped to
atmosphere.
* Units using additional extension collars must use adapter lid and/or extension collars included
with unit.
TSS-95-ECA
Solids Separator
MAX DEPTH TO CENTER
OF INLET: 60”