User's Manual
Table Of Contents
- Mechanical Description
- Hardware Installation
- Connecting the Ethernet Cable
- Step 1
- Step 2
- Step 3
- Step 4
- 
- Step 5
- Step 7
- Step 8
- Attaching the Mounting Bracket
- Grounding the Antenna
- Connect the Power Cable
- Dual Ethernet Ports
- HTML Interface
- Passwords
- Information
- Wireless Settings
- Image File Name
- Enabled
- Enabled
- Enable Access Control
- QOS
- Why is coiling the LMR or CAT5 bad?
- What standard does Tranzeo Wireless equipment meet?
- Is lightning damaged covered by the Warranty?
- Where to Ground the device
- Ungrounded Radio
- Grounded Radio
- Best Practices
Step 8
Attaching the Mounting Bracket
Grounding the Antenna
Using a #6 Green grounding wire, connect the Grounding Lug on the radio to a proper ground. See
APPENDIX A Lighting Information for more information.
Place the Ethernet boot over the 4 Screw Posts.
Apply 4 Kept nuts to the screw posts and tighten
until the gasket makes full contact with the
Ethernet boot. The gasket should be at least
50% compressed.
As shown below, the U-Bolt is designed to mount
around a pole. Tighten bolts sufficiently to
prevent any movement.
Down or up tilt can be adjusted by swinging the
unit before tightening the U-Bolt.
Optional dual port boot specific note.
If you are not going to be using the second port
make sure that it is tightened down to ensure a
weather-tight seal.